Visit
Official Website

Kualiti Alam Hijau (M) Sdn Bhd
43, Jalan PJU 10/10C,
Saujana Damansara, PJU 10,
47830 Petaling Jaya,
Selangor, Malaysia.
+603-6150 8812
+603-6150 8813
Johor Branch
No 1, Jalan Bukit Impian 17,
Taman Impian Emas,
81300 Skudai, Johor Bahru,
Johor, Malaysia.
+607-554 0190
+607-554 0193
kah.johor@gmail.com

Penang Branch
49, Persiaran Mutiara 2,
Pusat Komersial Bandar Tasek Mutiara,
14120 Simpang Ampat,
Penang, Malaysia.
+604-505 9991
+604 505 7991
kah.penang@gmail.com

Perak Branch
19, Laluan Tupai 2,
Jalan Tupai, 34000
Taiping, Perak, Malaysia.
+605-805 8540
+605-805 8541
kah.perak@gmail.com

Desludging POME Service

Previous 2 / 5 Next

Quantity
Add Quotation


 

Desludging POME Service in Malaysia – Kualiti Alam Hijau (M) Sdn Bhd

Professional Palm Oil Mill Sludge Removal | Scum Oil Extraction | DOE-Compliant Solutions

 

About Us

Kualiti Alam Hijau (M) Sdn Bhd is a certified environmental solutions provider specialising in POME desludging, scum oil extraction, and palm oil waste management. With extensive experience across Malaysia—including Peninsular Malaysia, Sabah & Sarawak—we help mills restore pond capacity, improve compliance, and maximise recoverable oil value.


What Is Desludging POME?

Desludging POME is the process of removing accumulated sludge, solids, and scum oil from POME ponds such as:

  • Cooling Pond

  • Mixing Pond

  • Anaerobic Pond

  • Dumping Pond

POME sludge buildup reduces pond performance, releases methane, and risks DOE non-compliance.
A systematic desludging program ensures smooth operations, better effluent quality, and safer environmental management.


Why Palm Oil Mills Choose Kualiti Alam Hijau (M) Sdn Bhd

1. Restore Pond Capacity & Improve Flow

Sludge accumulation decreases pond efficiency. Our desludging system restores the original depth and improves liquid circulation.

2. DOE & Environmental Compliance

We help mills prevent:

  • Overflow

  • High BOD/COD

  • Environmental pollution

  • DOE penalties

3. Maximum Scum Oil Recovery

Our high-efficiency extraction system delivers:

  • Higher scum oil yield

  • Faster processing

  • Additional revenue for the mill

4. Fast, Safe & No Downtime

  • Operation continues even during rain

  • Suitable for all pond types

  • Uses industrial-grade pumps & machinery


Our Full Desludging POME Service Includes

✔ Sludge removal from all POME ponds

✔ Scum oil & sludge oil extraction

✔ Silt & solid waste removal

✔ Pumping, excavator & floating hose system

✔ Free pond cleaning & levelling

✔ Environmental reporting with photos & records

✔ DOE & MPOB compliant process


Our Desludging Method (SEO: POME treatment process, desludging workflow)

  1. Site inspection & sludge-depth measurement

  2. Mobilisation of high-capacity pumps

  3. Sludge extraction from bottom layers

  4. Scum oil separation & processing

  5. Pond cleaning, levelling & stabilisation

  6. Final compliance report for management & DOE audit


Industries We Serve

  • Palm Oil Mills (90 TPH, 60 TPH, 120 TPH & more)

  • Government-linked mills

  • Private & RSPO-certified mills

  • Mills with open pond systems


Why We Are Malaysia’s Preferred POME Desludging Contractor

  • ✔ Registered environmental contractor

  • ✔ Experienced team specialising in POME

  • ✔ High extraction efficiency

  • ✔ Transparent & competitive pricing

  • ✔ Fast mobilisation throughout Malaysia


Contact Kualiti Alam Hijau (M) Sdn Bhd

Restore your POME pond performance today.
We offer fast mobilisation, maximum scum oil recovery, and full DOE compliance.

📞  WhatsApp: http://www.wasap.my/+60178785593/dislugingpome

📍 Coverage: Whole Malaysia – Semenanjung, Sabah, Sarawak

Please leave your enquiry here, we will reply as soon as possible.
Name*  
Company Name  
Product Interested  
Quantity  
Email*  
Contact No.*  
Messages*  
   

You have 0 items in you cart. Would you like to checkout now?
0 items
available in
Subscribe Newsletter